Built by engineers, for engineers
Size the cables, build the schedule, lay out the containment, calculate the demand and issue the drawing set — from one model, with the working shown.
Single line diagram — worked example
Live renderer · drag to pan · click to zoom · hover a feeder to trace it
Not a screenshot — the same renderer the tool uses, driven by the same model that exports to DXF for CAD and to PDF for the report.
What it does
01
To AS/NZS 3008.1.1. Every result states the table it came from, the derating factors applied and the governing constraint — so a reviewer can follow the calculation instead of trusting it.
02
AS/NZS 3000 Appendix C by load group, or ADMD where the design is still at concept stage and you need a supply figure now.
03
Trays, conduits and trenches sized from the cables actually routed through them. Change a tray’s grouping and every circuit it under-derates is flagged for re-size under Cl 3.5.
04
J9D4 share and per-space allowance, carried through to the DB-EV schedule and the building’s maximum demand.
05
Single line diagram to DXF and PDF, cable schedule to Excel, specification to Word. Change the design once and the set follows.
06
Every document leaves carrying a verification notice. Results are a design aid — verify to AS/NZS and certify by a CPEng.
Already have an account?
Pick up where the last revision left off.